< Back to case studies Next case study >

CONTROLLED REPLACEMENT OF VERTICAL VESSEL SECTION

Portobello-RMF fabricated a vertical vessel replacement section to specific strict measurement requirements.

CONTROLLED REPLACEMENT OF VERTICAL VESSEL SECTION thumbnail
  • Scope of supply: Vertical Vessel Replacement Section
  • Design Code: ASME Viii Div. 1
  • Size: 3.9m diameter x 9.4m length x 50 tonnes
  • Materials: Carbon Steel Clad with Alloy 400
  • Process: Refinery Column
  • Project: De-propanizer Cone Section
  • Key Challenges: Fabrication to tight tolerances, diameter had to be within +/- 2mm to ensure clean fit up on site, handling of item due to size and weight.
< Back to case studies Next case study >
FPAL Made In Sheffield Fit 4 Nuclear EIC Pressure Vessel Maintenance Forum Achilles verified for chemical Supply chain for nuclear ISO 9001:2015 ASME Setting The Standard